LKKER SCM is not affected by COVID lockdown restrictions.

lkkerscm@lkkdesign.com     

 

Shenzhen, May 15, 2025 — Within 24 hours of the U.S.-China Geneva Trade Agreement taking effect on May 14, Persona Doctors' executive team arrived at LKK Design's Shenzhen headquarters to relaunch their needle-free injector partnership. This strategic reboot combines precision medical device engineering with integrated consumables solutions, demonstrating cross-border industrial resilience amid evolving trade policies.

[caption id="attachment_14007" align="alignnone" width="2287"]Needle-Free Injector2 meeting[/caption]

Technical Breakthrough: ±0.02mm Tolerance Redefines Precision Standards

The engineering teams finalized three critical advancements during intensive technical reviews:

  1. Advanced Tooling: Achieved ±0.02mm component tolerance using 5-axis CNC machining, exceeding ISO 13485 medical device standards by 40%

  2. Eco-Packaging: Foldable paper-plastic packaging passed ISTA 3A certification with 28% reduced carbon footprint

  3. Rapid Deployment: Slashed design-to-production timeline to 30 days – 67% faster than industry average

"Our modular design architecture enables rapid prototype iteration within 72 hours."
— James Deng, VP of Engineering, LKK Design

Dual-Pillar Strategy: Device Innovation & Consumables Integration

The partnership expansion establishes a comprehensive supply framework:

  • Needle Systems: Multi-million unit annual procurement agreement, with initial shipments scheduled for Q3 2025

  • Fluid Dynamics: Optimized injection parameters for enhanced dosage consistency

  • Traceability: QR-code-based tracking system covering full product lifecycleNeedle-Free Injector3

Three-Year Roadmap: Phased Technical Evolution

2025-2027 Strategic Development Plan

  1. Immediate Priorities (Q3 2025)

    • Ambidextrous handle configuration development

    • Medical-grade sealing components lifespan extension program

  2. Mid-Term Objectives (2026)

    • Compact pediatric model targeting 30% weight reduction

    • Metallic component substitution feasibility study

  3. Long-Term Vision (2027)

    • Pre-filled cartridge integration solution.     Learn more

WhatsApp Us Go To Top