Introduction: Determine product testing items and prepare product inspection standards based on international standards, national standards, industrial standards, customer-specific requirements and the results of the testing and evaluation so as to ensure the quality and safety of the product and safeguard the immediate interests of consumers.

Service content: Determine product information (parameters, sales area, product classification, etc.), develop test schemes and plans, arrange tests, confirm test results, remedy for non-conforming products, test report output

Project Period: 23 working days after certification (this period only applies to enterprises for which certification precedes factory examination)

Materials Provided by Customers: business license, application information, ODM or OEM agreement, product nameplate, product specifications, key component list, circuit schematic diagram, formal application, manufacturing enterprise’s self-declaration and letter of commitment to factory quality assurance capabilities, consistency statement, CCC factory check & survey,etc.

Output: test/certification training plan, internal test/certification report, internal test/certification rectification plan, and technical guidance scheme, plan, and test/certification report  for missing items in test/certification

  Work Subject Work Content
1 Signing a service contrac Confirm the signed quotation sheet for the certification program or sign a technical certification service contract with Lianyu.
2 Sample and materials assessment Provide samples for pre-testing and provide certification materials for assessment according to requirements.
3 Instructive investigation and survey prior to factory examination

Conduct a preliminary investigation and survey on the production factory (preparatory work prior to factory examination).

4 Certification application acceptance Submit a certification application to national certification authorities.
5 Formal submission for testing

Submit test samples to a designated state lab.

6 Qualification test report The lab conducts testing and issues a CCC product qualification test report.
7 Qualification assessment by certification authorities Submit the qualification report to state certification authorities for report assessment.
8 Collection of the CCC certificate

Certification authorities assess whether the requirements for issuing a certificate are met; if yes, authorities make a CCC certificate and issue it to the applicant.

9 Instructions for factory examination Provide instructions to the production factory regarding factory examination, complete factory examination materials, and review other elements.
10 Formal factory examination Submit a factory examination application to state certification authorities and designate a date for factory examination.
11 Reporting qualification after factory examination State examiners send a factory examination qualification report to state certification authorities.

Other Service

solution November 2018

Feasibility Assessment

Analyze the quality, cost, schedule, resources and feasibility of the product

  • Industrial Design

    Through the creative conception, analyze the design according to the competing products, user preferences and usage scenarios to define the new product design style, realize a practical design based on innovation.

  • Hardware & Software Development

    Develop product hardware and card software; standardize hardware development processes; control hardware development quality;

  • Mechanical Design

    Design the internal infrastructure, mechanical functions, hardware and software functions of the product after determining the appearance of...

  • Prototype Making

    Review the appearance process and mechanism before the manufacture of product and perform the...

  • Crowd-design tasks

    Through the different tasks on the LKKER platform, ideas of more than one million registered users are obtained, the products are defined with a large number of accurate user feedbacks.

  • Supplier Matching

    Carry out primary review, quality inspection, process review and quality system review for suppliers according to the customer's ...

  • Mold Design and Making

    See how a unified source-to-pay platform can help you navigate a digital-first future. Learn more about SMART by LKK

  • Pilot-Production

    Obtain good process control, verify the feasibility of mass production, determine and improve the...

  • Testing and Certification

    Determine product testing items and prepare product inspection standards based on international standards...

  • Production and Supply

    Decompose the product manufacturing sequence according to the process, assign the production tasks for each...

  • Project Management

    Provide the most professional project engineering management solutions in the course of product implementation...

Latest

September 2018

LKK LKKER 2018 Xspecies Design Exhibition Kicked Off Beijing International Design Week

On September 20th, the 2018 Beijing International Design Week Design Expo was officially opened at the Beijing Agricultural Exhibition Center, which was co-sponsored by LKK Innovation Group (hereinafter referred to as “LKK”) and LKKER (LKKER) sharing design platform.

Online Chat Leave Message Go To Top